Piping 2D step by step

The workflow

Goal: draw a plumbing plan on the floor plan of the sample project and then edit it - from the empty plan to the bill of materials.

The goal of this page: parallel pipes in the corridor (1), crossing with heating (2), elevation change at the corner (3), branch line to the risers in the shaft (4), elevation symbols (5) and the elevation table (6)
The goal of this page: parallel pipes in the corridor (1), crossing with heating (2), elevation change at the corner (3), branch line to the risers in the shaft (4), elevation symbols (5) and the elevation table (6)

The main pipes run in the corridor along the wall, branch lines lead through the corridor wall to the shafts in the wet rooms. Proceed as follows:

  1. Draw the parallel pipes in the corridor
  2. Cross and change the system elevation
  3. Insert the risers in the shaft
  4. Connectors and pipe at the fixture
  5. Connect a manifold with PEX pipes
  6. Edit: system elevation, move, connect, break
  7. Put symbols into the pipe
  8. Elevation symbols and elevation table
  9. The bill of materials

1. Draw the parallel pipes in the corridor

Parallel pipes in the basement corridor: cold water, hot water and recirculation side by side (1), interrupted below the heating (2), elevation change at the corner (3), branch line through the corridor wall to the risers (4)
Parallel pipes in the basement corridor: cold water, hot water and recirculation side by side (1), interrupted below the heating (2), elevation change at the corner (3), branch line through the corridor wall to the risers (4)
  1. Page Pipe: under Parallel pipes choose a riser template with cold water, hot water and recirculation (three pipes at the spacing of the template) and the system elevation "2. Lage".
  2. Click Insert parallel pipes, click at the start of the corridor, enter the distance to the corridor wall with A.
  3. Draw along the corridor, click at the corner, draw through the corridor wall into the shaft, Enter.

Keys at the cursor

KeyEffect
Awall offset, system elevation, fixed length
Sthe pipes to the other side of the drawing line
Enterend the run
Video coming soon: Piping 2D step 1: parallel pipes in the corridor

2. Cross and change the system elevation

Crossing: the pipes of the 2nd system elevation are interrupted (1), the heating in the 1st runs through (2)
Crossing: the pipes of the 2nd system elevation are interrupted (1), the heating in the 1st runs through (2)
Elevation change at the corner: the circle shows the change (1), the upper pipe runs to the center of the circle (2), the lower ends at its edge (3)
Elevation change at the corner: the circle shows the change (1), the upper pipe runs to the center of the circle (2), the lower ends at its edge (3)

More: Crossings, Elevation change.

Video coming soon: Piping 2D step 2: crossing and elevation change

3. Insert the risers in the shaft

A row of three rise/drop symbols in the shaft of the bathroom (1), each riser with the insulation circle around the pipe (2)
A row of three rise/drop symbols in the shaft of the bathroom (1), each riser with the insulation circle around the pipe (2)
  1. Page Risers/connectors: choose the riser template, Insert risers/connectors.
  2. The risers hang at the cursor, the arrow is on the diagonal (up = top right). Space switches the riser you hold; click into the shaft.
  3. The branch line from step 1 ends at the riser: going down in the center, otherwise at the circle.

More: Insert riser.

Video coming soon: Piping 2D step 3: risers in the shaft

4. Connectors and pipe at the fixture

The connectors of the lavatory template: cold water (1), hot water (2), a pipe starts at each (3)
The connectors of the lavatory template: cold water (1), hot water (2), a pipe starts at each (3)
The cold water pipe from the connector of the lavatory (1) over two corners (2, 3) to the riser in the shaft (4)
The cold water pipe from the connector of the lavatory (1) over two corners (2, 3) to the riser in the shaft (4)
  1. Page Risers/connectors: under Connectors choose the lavatory template and place it at the lavatory - cold water left, hot water right.
  2. Page Pipe: Insert pipe, start at the connector (system and size come from the connector), draw over the corners to the riser.
  3. For a PEX pipe check flexible: every corner is rounded.

More: Connector, Pipe, flexible.

Video coming soon: Piping 2D step 4: connectors and pipe

5. Connect a manifold with PEX pipes

A manifold with box in the in-wall carrier (1), outlets for two systems (2), flexible PEX pipes to the shower (3) and to the lavatory (4)
A manifold with box in the in-wall carrier (1), outlets for two systems (2), flexible PEX pipes to the shower (3) and to the lavatory (4)
  1. Page Manifold: choose a template (systems, number of outlets, box), Insert manifold, align with R, place it in the in-wall carrier.
  2. Connect PEX: select the manifold and the connectors of the fixtures. LuaCAD shows complete solutions; the selected one has the fewest crossings.
  3. Enter accepts. Every used outlet is stored at its pipe.
Video coming soon: Piping 2D step 5: manifold with PEX

6. Edit: system elevation, move, connect, break

Change system elevation: how many pipes are selected (1), their current system elevation (2), the new one (3), OK (4)
Change system elevation: how many pipes are selected (1), their current system elevation (2), the new one (3), OK (4)
Move, before/after: the vertical pipe (1) is moved 250 mm to the right, the neighbors adapt (2)
Move, before/after: the vertical pipe (1) is moved 250 mm to the right, the neighbors adapt (2)

More: Change system elevation, Move, Connect, Break.

Video coming soon: Piping 2D step 6: editing

7. Put symbols into the pipe

A ball valve in front of the riser (1) and a check valve in the in-wall carrier (2) - the pipe is interrupted by the length of the symbol
A ball valve in front of the riser (1) and a check valve in the in-wall carrier (2) - the pipe is interrupted by the length of the symbol

Page Symbols: click the symbol, Insert, click the pipe - it turns into the pipe, the pipe gets a gap. More: Symbol.

Video coming soon: Piping 2D step 7: symbols

8. Elevation symbols and elevation table

An elevation symbol with the short name of the system elevation at the heating (1) and at the parallel pipes (2), the elevation table (3)
An elevation symbol with the short name of the system elevation at the heating (1) and at the parallel pipes (2), the elevation table (3)

Page Elevations: Draw elevation symbols puts the short name of its system elevation at every pipe, the elevation table places the table of system elevations with their heights in the plan. More: Elevation symbols.

Video coming soon: Piping 2D step 8: elevation symbols

9. The bill of materials

The bill of materials in the drawing: pipe per size with length (1), flexible pipe (2), elbows with count (3), the manifold (4)
The bill of materials in the drawing: pipe per size with length (1), flexible pipe (2), elbows with count (3), the manifold (4)

Footer or page Elevations > Bill of materials: the list counts pipes with length per size, elbows, tees and elevation changes from the geometry, manifolds and symbols with count. Example: "pipe 28, 12.4 m". More: Bill of materials.

Video coming soon: Piping 2D step 9: bill of materials