Example 2 – A piping plan step by step

The workflow

Goal: draw a plumbing plan on the floor plan of the sample project and then edit it - from the empty plan to the bill of materials.

The goal of this page: parallel pipes in the corridor (1), crossing with heating (2), elevation change at the corner (3), branch line to the risers in the shaft (4), elevation symbols (5) and the elevation table (6)
The goal of this page: parallel pipes in the corridor 1, crossing with heating 2, elevation change at the corner 3, branch line to the risers in the shaft 4, elevation symbols 5 and the elevation table 6

The main pipes run in the corridor along the wall, branch lines lead through the corridor wall to the shafts in the wet rooms. Proceed as follows:

  1. Draw the parallel pipes in the corridor
  2. Cross and change the system elevation
  3. Insert the risers in the shaft
  4. Connectors and pipe at the fixture
  5. Connect a manifold with PEX pipes
  6. Edit: system elevation, move, connect, break
  7. Put symbols into the pipe
  8. Elevation symbols and elevation table
  9. The bill of materials

1. Draw the parallel pipes in the corridor

First draw three pipes as parallel pipes along the corridor wall.

Video coming soon: Piping 2D step 1: parallel pipes in the corridor
Parallel pipes in the corridor: cold water, hot water and recirculation side by side (1), interrupted below the heating (2), elevation change at the corner (3), branch line through the corridor wall to the risers (4)
Parallel pipes in the corridor: cold water, hot water and recirculation side by side 1, interrupted below the heating 2, elevation change at the corner 3, branch line through the corridor wall to the risers 4
  1. Page Risers/connectors: choose a riser template with cold water, hot water and recirculation (three pipes at the spacing of the template) and under Parallel pipes the system elevation "2. Lage".
  2. Click Insert parallel pipes, click at the start of the corridor, enter the distance to the corridor wall with A.
  3. Draw along the corridor, click at the corner, draw through the corridor wall into the shaft, Enter.
Keys at the cursor
KeyEffect
Awall offset, system elevation, fixed length
Sthe pipes to the other side of the drawing line
Enterend the run

2. Cross and change the system elevation

Where pipes cross or change the system elevation, the plan shows a gap and a circle.

Video coming soon: Piping 2D step 2: crossing and elevation change
Crossing: the pipes of the 2nd system elevation are interrupted (1), the heating in the 1st runs through (2)
Crossing: the pipes of the 2nd system elevation are interrupted 1, the heating in the 1st runs through 2
Elevation change at the corner: the circle shows the change (1), the upper pipe runs to the center of the circle (2), the lower ends at its edge (3)
Elevation change at the corner: the circle shows the change 1, the upper pipe runs to the center of the circle 2, the lower ends at its edge 3

More: Crossings, Elevation change.

3. Insert the risers in the shaft

In the shaft you place the risers as rise/drop symbols.

Video coming soon: Piping 2D step 3: risers in the shaft
A row of three rise/drop symbols in the shaft of the bathroom (1), each riser with the insulation circle around the pipe (2)
A row of three rise/drop symbols in the shaft of the bathroom 1, each riser with the insulation circle around the pipe 2
  1. Page Risers/connectors: choose the riser template, Insert risers/connectors.
  2. The risers hang at the cursor, the arrow is on the diagonal (up = top right). Space switches the riser you hold; click into the shaft.
  3. The branch line from step 1 ends at the riser: going down in the center, otherwise at the circle.

More: Insert riser.

4. Connectors and pipe at the fixture

At the fixture you place the connectors and run the pipe to the riser.

Video coming soon: Piping 2D step 4: connectors and pipe
The connectors of the lavatory template: cold water (1), hot water (2), a pipe starts at each (3)
The connectors of the lavatory template: cold water 1, hot water 2, a pipe starts at each 3
The cold water pipe from the connector of the lavatory (1) over two corners (2), (3) to the riser in the shaft (4)
The cold water pipe from the connector of the lavatory 1 over two corners 2, 3 to the riser in the shaft 4
  1. Page Risers/connectors: under Connectors choose the lavatory template and place it at the lavatory - cold water left, hot water right.
  2. Page Pipe: Insert pipe, start at the connector (system and size come from the connector), draw over the corners to the riser.
  3. For a PEX pipe check flexible: every corner is rounded.

More: Connector, Pipe, flexible.

5. Connect a manifold with PEX pipes

A manifold in the in-wall carrier gets flexible PEX pipes to the fixtures.

Video coming soon: Piping 2D step 5: manifold with PEX
A manifold with box in the in-wall carrier (1), outlets for two systems (2), flexible PEX pipes to the shower (3) and to the lavatory (4)
A manifold with box in the in-wall carrier 1, outlets for two systems 2, flexible PEX pipes to the shower 3 and to the lavatory 4
  1. Page Manifold: choose a template (systems, number of outlets, box), Insert manifold, align with R, place it in the in-wall carrier.
  2. Connect PEX: select the manifold and the connectors of the fixtures. LuaCAD shows complete solutions; the selected one has the fewest crossings.
  3. Enter accepts. Every used outlet is stored at its pipe.

6. Edit: system elevation, move, connect, break

Here you change the system elevation and the route of the drawn pipes.

Video coming soon: Piping 2D step 6: editing
Change system elevation: how many pipes are selected (1), their current system elevation (2), the new one (3), OK (4)
Change system elevation: how many pipes are selected 1, their current system elevation 2, the new one 3, OK 4
Move, before/after: the vertical pipe (1) is moved 250 mm to the right, the neighbors adapt (2)
Move, before/after: the vertical pipe 1 is moved 250 mm to the right, the neighbors adapt 2

More: Change system elevation, Move, Connect, Break.

7. Put symbols into the pipe

You put valves into the pipe as symbols.

Video coming soon: Piping 2D step 7: symbols
A ball valve in front of the riser (1) and a check valve in the in-wall carrier (2) - the pipe is interrupted by the length of the symbol
A ball valve in front of the riser 1 and a check valve in the in-wall carrier 2 - the pipe is interrupted by the length of the symbol

Page Symbols: click the symbol, Insert, click the pipe - it turns into the pipe, the pipe gets a gap. More: Symbol.

8. Elevation symbols and elevation table

Elevation symbols and the elevation table show the system elevation of each pipe.

Video coming soon: Piping 2D step 8: elevation symbols
An elevation symbol with the short name of the system elevation at the heating (1) and at the parallel pipes (2), the elevation table (3)
An elevation symbol with the short name of the system elevation at the heating 1 and at the parallel pipes 2, the elevation table 3

Page Elevations: Draw elevation symbols puts the short name of its system elevation at every pipe, the elevation table places the table of system elevations with their heights in the plan. More: Elevation symbols.

9. The bill of materials

Finally, output the bill of materials.

Video coming soon: Piping 2D step 9: bill of materials
The bill of materials in the drawing: pipe per size with length (1), flexible pipe (2), elbows with count (3), the manifold (4)
The bill of materials in the drawing: pipe per size with length 1, flexible pipe 2, elbows with count 3, the manifold 4

Footer or page Elevations > Bill of materials: the list counts pipes with length per size, elbows, tees and elevation changes from the geometry, manifolds and symbols with count. Example: "pipe 28, 12.4 m". More: Bill of materials.