Example 1 – Water for an apartment

From the empty floor plan to the finished riser diagram: apartment A2 on the 1st floor of the sample project, the plumbing drawing of this level. Cold water, hot water and recirculation run along the wall in the corridor and below the heating into shaft SA2-B of the bathroom; there they join the risers that go through the levels. From the shaft a manifold in the bathroom feeds the fixtures through flexible PEX pipes. One sentence, one picture and the clicks per step – the light blue numbers in the text are the numbers in the picture above. Variants and details are collapsed under "More".

1. Open the palette and choose the riser template

The parallel pipes and the risers take their systems and sizes from the riser template.

The Risers/connectors page: the riser template for cold water, hot water and recirculation (1), Insert riser/connectors (2), the system elevation of the parallel pipes (3), Insert parallel pipes (4)
The Risers/connectors page: the riser template for cold water, hot water and recirculation 1, Insert riser/connectors 2, the system elevation of the parallel pipes 3, Insert parallel pipes 4

Ribbon › LuaCAD tab › Piping 2D, in the palette the Risers/connectors page.

More details
  • The factory system elevations are 150/300/450/600 mm below the bottom of the slab; reference level and distance are in parentheses. Create your own in the gear menu › System elevations – see Creating system elevations.
  • Palette values only apply to pipes and parts you insert from now on – change existing ones with the tools.
  • A single pipe instead of several side by side: page Pipe – see Inserting a pipe.

2. Place the risers in the shaft

Piping 2D draws the vertical pipes in the shaft as riser symbols: one circle per pipe, the arrow tells where it runs.

The three risers in shaft SA2-B: cold water (1), hot water (2) and recirculation (3), each with the circle of its insulation
The three risers in shaft SA2-B: cold water 1, hot water 2 and recirculation 3, each with the circle of its insulation

Insert riser/connectors (Risers/connectors page), then:

More details
  • If the insulation circles need more room than the spacing of the template, Piping 2D increases it and says so on the command line.
  • R rotates the row of risers; the arrow stays on the diagonal.
  • More under Inserting risers and Choosing a template.

3. Draw the parallel pipes in the corridor

Heating supply and return lie on the 1st system elevation in the corridor. The plumbing pipes run beside them, turn above the shaft and go through the wall to the risers.

The parallel pipes in the corridor (1), the elevation change at the corner (2), the gap below the heating (3), the end at the risers in the shaft (4)
The parallel pipes in the corridor 1, the elevation change at the corner 2, the gap below the heating 3, the end at the risers in the shaft 4
More details

4. Look at the crossing and the elevation change

What the system elevations do in the plan shows the spot above the shaft close up.

Close up: the circle of the elevation change (1), the gap of the 2nd system elevation below the heating (2), the heating supply on the 1st system elevation runs through (3)
Close up: the circle of the elevation change 1, the gap of the 2nd system elevation below the heating 2, the heating supply on the 1st system elevation runs through 3
More details
  • If a new pipe crosses a pipe on the same system elevation, Piping 2D asks when you click (choose another system elevation or continue).
  • Set the length of the gap and the size of the circle in the gear menu › Elevation marking.
  • More under Crossings and Elevation change.

5. Place the connectors at the fixtures

A connector is the pipe end of a fixture: system and size come from the connector template.

The connectors at the lavatory (1), at the toilet (2) and at the shower (3) – green cold water, red hot water
The connectors at the lavatory 1, at the toilet 2 and at the shower 3 – green cold water, red hot water

Risers/connectors page, in the list under Connectors:

More details
  • Instead of connector templates: Fixtures from the Block Library places a whole 2D fixture with its connectors, Connectors only from the Block Library only the connectors at a fixture of the architectural plan – see Fixtures from the Block Library.
  • More under Inserting connectors.

6. Insert and connect the manifold

The manifold sits in the in-wall carrier at the right wall of the bathroom; the risers feed it, PEX pipes go to the fixtures.

The supply pipes from the risers (1), manifold V1 with cabinet (2), the PEX pipes to the lavatory (3), to the toilet (4) and to the shower (5)
The supply pipes from the risers 1, manifold V1 with cabinet 2, the PEX pipes to the lavatory 3, to the toilet 4 and to the shower 5
More details

7. Elevation symbols and elevation table

Whoever reads the plan should see on which system elevation a pipe lies.

The elevation symbols at the heating (1) and at the parallel pipes (2), the elevation table in the corridor (3)
The elevation symbols at the heating 1 and at the parallel pipes 2, the elevation table in the corridor 3
More details

8. The bill of materials

The quantities of the plan as a table next to the floor plan.

The bill of materials: pipes per size with length (1), the PEX pipes as flexible pipes (2), the elbows per size (3), the manifold (4)
The bill of materials: pipes per size with length 1, the PEX pipes as flexible pipes 2, the elbows per size 3, the manifold 4

Output page › Bill of materials: the table hangs at the cursor, click next to the floor plan.

More details

9. The finished plan

The finished plan: the parallel pipes in the corridor (1), the crossing with the heating (2), the elevation change (3), the risers in the shaft (4), an elevation symbol (5), the elevation table (6), the manifold with the PEX pipes (7)
The finished plan: the parallel pipes in the corridor 1, the crossing with the heating 2, the elevation change 3, the risers in the shaft 4, an elevation symbol 5, the elevation table 6, the manifold with the PEX pipes 7
More details
  • Later the plan can be converted to 3D in Piping 3D – see On to 3D.

10. Changing it afterwards

You change it like a CAD object – crossings, elevation changes and neighbors adapt.

Change it with a grip

Picture coming soonPlan view: a pipe selected – grips at the start (1), in the middle (2) and at the end (3)
  1. Click the pipe – the GstarCAD grips appear at the start, in the middle and at the end.
  2. Click an end grip, drag it and click at the new location. The pipe becomes longer or shorter; if other pipes end there, their ends move along.
  3. Crossings, elevation changes and symbols follow by themselves when the command ends. More under Editing with grips and GstarCAD commands.

Move

Plan view, left before, right after: the vertical pipe (1) moved 250 mm sideways to the right up to the wall; the connected pipes (2) have become longer or shorter
Plan view, left before, right after: the vertical pipe 1 moved 250 mm sideways to the right up to the wall; the connected pipes 2 have become longer or shorter
  1. In the tools at the bottom click Move and click the pipe 1; Enter.
  2. Click the new location – or press A and type a distance, for example 250.
  3. The neighbors are shortened, extended or joined again 2. More under Move; the GstarCAD commands (MOVE, grips, STRETCH …) work the same way.

Change the system elevation

The Change system elevation dialog box: how many pipes are selected (1), their current system elevation (2), the new system elevation with Pick button (3), OK (4)
The Change system elevation dialog box: how many pipes are selected 1, their current system elevation 2, the new system elevation with Pick button 3, OK 4
  • In the tools at the bottom click Change system elevation and select the pipe; Enter. The dialog box shows 1 the number of selected pipes and 2 their current system elevation.
  • 3 Choose the new system elevation – the one from the palette is proposed – and 4 OK.
  • The pipe gets the linetype of the new system elevation; gaps at crossings and elevation change circles follow by themselves. More under Changing the system elevation.

On to example 2

The video shows example 1 once more as a whole; then continue with these pages.

Video coming soon: Your first pipe
Other ways
  • Bendable pipes with rounded corners: Flexible.
  • A valve in the pipe: Inserting a symbol.
  • Esc cancels any function; another button in the palette cancels the running command and starts the new one. A U undoes the last step.