LuaCAD Help

Example 1 – A bathroom

From an empty floor plan to finished cold and hot water pipes in 3D: the bathroom of an apartment on the first upper floor of the sample project, the plumbing drawing of level OG1. The risers stand in the shaft at the top right, the pipes run in the in-wall carrier to the lavatory and the toilet. Each step has one sentence, one picture and the clicks – the light blue numbers in the text are the numbers in the picture above. Variants and details are collapsed under "More".

1. Open the palette and choose the values

What is set at the top of the Pipe page applies to every pipe you insert afterwards.

The Pipe page for the bathroom: system (1), catalog (2), nominal size (3), Insert as "Generate 3D" (4), the Insert button (5), the system elevation (6) with the value 300 mm (7)
The Pipe page for the bathroom: system 1, catalog 2, nominal size 3, Insert as "Generate 3D" 4, the Insert button 5, the system elevation 6 with the value 300 mm 7

Ribbon › LuaCAD tab › Piping 3D – the palette opens on the Pipe page.

More details
  • Palette values apply only to parts you insert from now on – change what is already drawn with Change properties.
  • With "Routing Line" you draw only the axes and generate the 3D later; the difference is explained under Basic concepts.
  • The system elevation can also be absolute, a system elevation of the list or "free" (the elevation comes from the clicked point) – see Elevation and system elevation.

2. Insert the risers in the shaft

Cold and hot water reach the level through two risers. You insert both in one step from a riser template.

The dialog box "Insert riser": the two risers of the template (1), system, catalog and DN of the selected riser (2), the direction "through" (3), the target upwards (4) and downwards (5), the system elevation (6), OK (7)
The dialog box "Insert riser": the two risers of the template 1, system, catalog and DN of the selected riser 2, the direction "through" 3, the target upwards 4 and downwards 5, the system elevation 6, OK 7

Risers/connectors page: choose the riser template for cold and hot water in the list, click Insert riser/connectors. In the dialog box:

More details
  • What you change here applies only to this insertion; change the template itself under Managing riser and connector templates.
  • On the cursor the Space key switches the riser you hold, R rotates the row.
  • In the floor plan every riser is shown as a riser symbol: a circle with line and arrow on the diagonal as in DIN 1986-100 – with "through" the line goes through the circle.
  • If the level function is switched on in the project and a riser crosses a level boundary, LuaCAD asks whether to divide it across the levels – see Divide across levels.

3. Place the connectors of lavatory and toilet

The pipe connectors mark where the pipes end: angle stops at the lavatory, the flush tank of the toilet.

The bathroom in the floor plan: the cold water (1) and hot water (2) risers in the shaft, at the lavatory the hot water (3) and cold water connector (4), the cold water connector of the toilet (5) – all in the in-wall carrier
The bathroom in the floor plan: the cold water 1 and hot water 2 risers in the shaft, at the lavatory the hot water 3 and cold water connector 4, the cold water connector of the toilet 5 – all in the in-wall carrier

1 2 are the risers from step 2. Then on the Risers/connectors page:

More details
  • The elevation of a connector is always system elevation + offset of the template – with the system elevation FF + 300 from step 1 the angle stops would be at 850 mm. The command line names the elevation while inserting.
  • Fixtures from the block library bring their connectors along – see Fixtures from the block library.
  • More under Placing a pipe connector.

4. Draw the pipes

Each pipe starts at the connector of a fixture and ends on the riser or on a pipe that is already there.

The pipes and their clicks: cold water from the toilet (1) to the riser (2); from the lavatory (3) to the corner below the toilet (4); hot water from the lavatory (5) via the corners (6) and (7) to the riser (8)
The pipes and their clicks: cold water from the toilet 1 to the riser 2; from the lavatory 3 to the corner below the toilet 4; hot water from the lavatory 5 via the corners 6 and 7 to the riser 8

Pipe page, Insert:

Change the elevation while drawing

If a pipe has to go higher or lower in the middle of a run, for example below a beam, A on the cursor opens this dialog box:

The dialog box for the elevation while drawing: elevation from level (1), the value (2) with the calculated elevation (3), the wall offset for this run (4), OK (5)
The dialog box for the elevation while drawing: elevation from level 1, the value 2 with the calculated elevation 3, the wall offset for this run 4, OK 5
More details
  • The Space key switches between "snap to angle" (right angles, 45°) and free; the circle (in 3D the sphere) on the cursor shows how far pipe ends and connectors are caught.
  • A pipe only connects to pipes of its own system – cold water never to hot water.
  • All keys and options: Inserting a pipe, Elevation change while drawing.

5. The 3D

With "Generate 3D" as insert mode the 3D is done when the run ends: pipes, elbows and tees from the catalog, with 30 mm insulation.

The bathroom in an isometric view (insulation transparent): the DN 25 risers continue through the ceiling (1), the tee at the cold water riser (2), the vertical pipe to the flush tank (3), the tee below the toilet (4), elbow and vertical pipe to the lavatory (5), the hot water 100 mm higher (6) with its elbow at the lavatory (7)
The bathroom in an isometric view (insulation transparent): the DN 25 risers continue through the ceiling 1, the tee at the cold water riser 2, the vertical pipe to the flush tank 3, the tee below the toilet 4, elbow and vertical pipe to the lavatory 5, the hot water 100 mm higher 6 with its elbow at the lavatory 7
More details
  • If you have drawn with "Routing Line", click Generate 3D (Pipe page) and click the pipes – see Generate 3D.
  • LuaCAD numbers the parts of every network by itself (item numbers 3.1, 3.2 …); they appear in the parts list and can be annotated.
  • Pipes are created in bar lengths with press couplings in between – see Pipe lengths and couplings.

6. Insert the shut-off valves

In front of the riser each pipe gets a ball valve – so the bathroom can be shut off.

The two ball valves in the in-wall carrier in front of the shaft: in the hot water (1) and in the cold water (2); the pipes up to the tee at the riser (3) are placed again
The two ball valves in the in-wall carrier in front of the shaft: in the hot water 1 and in the cold water 2; the pipes up to the tee at the riser 3 are placed again

Symbols page: choose "ball valve", Insert, then:

The valve dialog box: system (1), description (2), nominal size (3), the connectors with length and type (4), reverse flow direction (5), OK (6)
The valve dialog box: system 1, description 2, nominal size 3, the connectors with length and type 4, reverse flow direction 5, OK 6

With Show the definition dialog box when inserting checked on the Symbols page – or later with Valve › Properties – this dialog box shows the values of the valve:

More details

7. Query a part

Which part sits where, with which item number? Pipe page › Query properties and click the tee below the toilet:

The values of the tee: description and article number (1), system and nominal size (2), the item number (3), the position (4), the specification of the routing line (5)
The values of the tee: description and article number 1, system and nominal size 2, the item number 3, the position 4, the specification of the routing line 5
More details

If you click a routing line instead of a part, the properties dialog box of the pipe opens. More under Querying properties.

8. Annotate and output the list

System and nominal size on every pipe – once per pipe is enough.

The bathroom in the floor plan, annotated with the factory template for system and DN: the cold water (1) and the hot water (2)
The bathroom in the floor plan, annotated with the factory template for system and DN: the cold water 1 and the hot water 2

Output page › Annotate:

More details
  • The annotation sticks to the pipe: if you move the pipe, the text moves along. A changed template does not change annotations already placed.
  • More under Annotating, Bill of materials and Parts list.

9. Change it afterwards

You edit like a CAD line – the 3D follows.

Edit with a grip

A pipe clicked: grips at the start (1), middle (2) and end (3); on the left a valve (4)
A pipe clicked: grips at the start 1, middle 2 and end 3; on the left a valve 4
  • Click the pipe (line or pipe) – 1 2 3 the grips appear.
  • A free end moves only in the pipe direction, a corner freely, the middle grip moves the whole segment; neighboring pipes and the 3D follow at the end of the command. A valve 4 has a grip in its middle and slides along its pipe.

Move

Click a pipe (1) and click the new position (2)
Click a pipe 1 and click the new position 2
  • Move (Pipe page) and click the pipe 1; Enter.
  • Click the new position 2 – or press A and type a distance, for example 50. Connected pipes are shortened or extended, valves move along.

If the pipe has 3D, "Move" removes it while you select; then Generate 3D again. More under Moving pipes.

Change elevation

Elevation changed: the middle pipe now lies at 2700 mm (1); the vertical connecting pieces have been created by themselves (2) (3)
Elevation changed: the middle pipe now lies at 2700 mm 1; the vertical connecting pieces have been created by themselves 2 3

Continue with example 2

The video shows example 1 once more as a whole; then continue with these pages.

Video coming soon: Quick start Piping 3D
Further ways
  • Several pipes side by side (cold water, hot water, recirculation) in one run: Parallel pipes.
  • A product with article number instead of a symbol: Adding and inserting a product.
  • Esc cancels every function; another button on the palette cancels the running command and starts the new one. U undoes the last step.